New challenges in the automation of electric power systems

Patricio Robles

Pontificia Universidad Cat

Correspondence: Patricio Robles, Pontificia Universidad Cat, Chile, Tel 56 32 2273696

Received: January 29, 2018 | Published: March 16, 2018

Citation: Robles P. New challenges in the automation of electric power systems. Int Rob Auto J. 2018;4(2):99-100. DOI: 10.15406/iratj.2018.04.00100

Download PDF

Abstract

An electric power system is composed by generating, transmission, distribution, and consumers subsystems. As consumption of electrical energy increases the operation of power systems becomes more complex, and more necessary is to have real-time monitoring and remote control of elements such as generators, substations, transmission lines and other physical facilities. This communication explores on new challenges in automation of operational processes originated by the increasing complexity of electric power systems. In particular the application of synchrophasor measurements to opportunately initiate automatic control actions under emergency conditions is briefly discussed.

Keywords: transmission system, renewable energy, monitoring, voltaje, frequency, power stability, synchrophasor

Abbreviations

SIC, central interconnected system; SING, great north interconnected System; FACTS, flexible alternating current transmission systems; SVC, static var compensator; SCADA, supervisory control and data acquisition; WAMS, wide area measurements system; TCSC, thyristor-controlled series compensator

Introduction

Power system automation included monitoring, evaluation, analysis, and control of processes associated with generation and transmission of electric energy from power stations to customers.1 Three main processes are included: data acquisition, power system supervision and control, all working in a coordinated automatic fashion. Data acquisition refers to collect data in the form of measured analog current or voltages values or the status of devices (open or closed). Power system supervision is carried out through the acquired data either at a remote site or locally at the device site. Control refers to sending command messages to operate power system devices such as circuit breakers. In this communication these concepts are discussed in the context of the chilean electric sector considering the challenges originated by the recent interconnection of the two main electric system SIC and SING and new interconnection projected with other electrical systems. In November 2017 the two main electric systems of Chile, SIC and SING, have been interconnected by a 500 kV transmission system resulting in an interconnected grid with a geographical extension of about 3000 kilometers from south to north of the country. Concerned with the automation, it is expected that several operational challenges will arise due to this interconnection and additionally due to the sustained increase in the generation coming from renewable energies like eolic generators, geothermal and photovoltaic systems, contributing at present with about 20 % of the produced energy. Traditionally the main issues related with the operation of Chilean electric systems have been those concerned with the control of the frequency and voltage for reaching stability of these variables. Power generation plants have systems that control the injected active and reactive power to the network and several FACTS like SVC are operating in the Chilean 500 kV transmission system. However the growth of this electrical system is leading to more requirements in data acquisition, data processing and control systems. Automation in the management of renewable energies is required considering that due to the variability in the available power, they introduce new uncertainties and parameters’ variations into the power grid, so that automation systems are required to connect these generation systems to the network and inject the corresponding energy in a coordinated way.

A widely used tool for managing the operation of electric power systems is the SCADA which supervises controls, optimizes and manages generation and transmission systems. This system is used in the Chilean interconnected system and is combined with a WAMS based on synchrophasor measurements that allow simultaneous data acquisition from several points of the system in times of the order of milliseconds, enhancing the real-time knowledge of the operators about the state of the system. This makes possible to take corrective actions before the system undergoes a critical condition that could lead it to a blackout.2 For instance the simultaneous measurement of voltage phase angles θ i ( t ) MathType@MTEF@5@5@+= feaagKart1ev2aqatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbd9wDYLwzYbItLDharqqtubsr 4rNCHbGeaGqiVCI8FfYJH8YrFfeuY=Hhbbf9v8qqaqFr0xc9pk0xbb a9q8WqFfeaY=biLkVcLq=JHqpepeea0=as0Fb9pgeaYRXxe9vr0=vr 0=vqpWqaaeaabiGaciaacaqabeaadaqaaqaaaOqaaKqbacbaaaaaaa aapeGaeqiUde3damaaBaaajuaibaWdbiaadMgaa8aabeaajuaGpeWa aeWaa8aabaWdbiaadshaaiaawIcacaGLPaaaaaa@3CFA@ in distant substation buses and register of the Corresponding difference θ ij ( t )= θ i ( t ) θ j ( t ) MathType@MTEF@5@5@+= feaagKart1ev2aqatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbd9wDYLwzYbItLDharqqtubsr 4rNCHbGeaGqiVCI8FfYJH8YrFfeuY=Hhbbf9v8qqaqFr0xc9pk0xbb a9q8WqFfeaY=biLkVcLq=JHqpepeea0=as0Fb9pgeaYRXxe9vr0=vr 0=vqpWqaaeaabiGaciaacaqabeaadaqaaqaaaOqaaKqbacbaaaaaaa aapeGaeqiUde3damaaBaaajuaibaWdbiaadMgacaWGQbaapaqabaqc fa4dbmaabmaapaqaa8qacaWG0baacaGLOaGaayzkaaGaeyypa0Jaeq iUde3damaaBaaajuaibaWdbiaadMgaa8aabeaajuaGpeWaaeWaa8aa baWdbiaadshaaiaawIcacaGLPaaacqGHsislcqaH4oqCpaWaaSbaaK qbGeaapeGaamOAaaWdaeqaaKqba+qadaqadaWdaeaapeGaamiDaaGa ayjkaiaawMcaaaaa@4C9D@ allow to opportunately initiate control actions such as generators redispatch,3 or decrease power flows of heavily loaded transmission lines by the action of TCSC.4 A possible control strategy could be based in use of these measurements to construct the matrix H of dimension NN MathType@MTEF@5@5@+= feaagKart1ev2aqatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbd9wDYLwzYbItLDharqqtubsr 4rNCHbGeaGqiVCI8FfYJH8YrFfeuY=Hhbbf9v8qqaqFr0xc9pk0xbb a9q8WqFfeaY=biLkVcLq=JHqpepeea0=as0Fb9pgeaYRXxe9vr0=vr 0=vqpWqaaeaabiGaciaacaqabeaadaqaaqaaaOqaaKqbacbaaaaaaa aapeGaamOtaiabgwSixlaad6eaaaa@3A8A@ with N being the number of buses of the grid and with elements θ ij ( t ) MathType@MTEF@5@5@+= feaagKart1ev2aqatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbd9wDYLwzYbItLDharqqtubsr 4rNCHbGeaGqiVCI8FfYJH8YrFfeuY=Hhbbf9v8qqaqFr0xc9pk0xbb a9q8WqFfeaY=biLkVcLq=JHqpepeea0=as0Fb9pgeaYRXxe9vr0=vr 0=vqpWqaaeaabiGaciaacaqabeaadaqaaqaaaOqaaKqbacbaaaaaaa aapeGaeqiUde3damaaBaaajuaibaWdbiaadMgacaWGQbaapaqabaqc fa4dbmaabmaapaqaa8qacaWG0baacaGLOaGaayzkaaaaaa@3DE9@ and evaluate the Frobenius norm defined as H= ( ij θ ij 2 ) 1/2 MathType@MTEF@5@5@+= feaagKart1ev2aaatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbd9wDYLwzYbItLDharqqtubsr 4rNCHbGeaGqiVCI8FfYJH8YrFfeuY=Hhbbf9v8qqaqFr0xc9pk0xbb a9q8WqFfeaY=biLkVcLq=JHqpepeea0=as0Fb9pgeaYRXxe9vr0=vr 0=vqpWqaaeaabiGaciaacaqabeaadaqaaqaaaOqaaKqbacbaaaaaaa aapeWaaGWaaeaacaWGibaacaGLAaJaay5gWaGaeyypa0Jaaiikamaa qababaGaeqiUde3aaSbaaKqbGeaacaWGPbGaamOAaaqcfayabaaaju aibaGaamyAaiaadQgaaKqbagqacqGHris5a8aadaahaaqabKqbGeaa peGaaGOmaaaajuaGcaGGPaWdamaaCaaabeqcfasaa8qacaaIXaGaai 4laiaaikdaaaaaaa@48BF@ . If this norm is higher than a reference value the beginning of a critical condition may be opportunately detected. Identifying the greater values of θ ij MathType@MTEF@5@5@+= feaagKart1ev2aqatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbd9wDYLwzYbItLDharqqtubsr 4rNCHbGeaGqiVCI8FfYJH8YrFfeuY=Hhbbf9v8qqaqFr0xc9pk0xbb a9q8WqFfeaY=biLkVcLq=JHqpepeea0=as0Fb9pgeaYRXxe9vr0=vr 0=vqpWqaaeaabiGaciaacaqabeaadaqaaqaaaOqaaKqbacbaaaaaaa aapeGaeqiUde3damaaBaaajuaibaWdbiaadMgacaWGQbaapaqabaaa aa@3AAA@ the heaviest load circuits may be known in real time so that the corresponding control actions could be automatically taken.

Conclusion

As electrical power systems grow more requirements of robust control and automation schemes arise for obtaining a reliable operation. In this communication this issue has been briefly discussed in the context of the Chilean Interconnected System, in particular the application of synchrophasor measurements to opportunately initiate control actions in the case of heavily loaded transmission lines. For preventing blackouts produced by a cascade of events initiated by a local disturbance, it is advisable to make more research concerned with the automatic identification of the more convenient ways to separate the system in electric islands under a local disturbance and to get a balance between generation and load in each of these islands for keeping suitable values of the corresponding frequencies and voltages during the emergency condition.

Acknowledgements

This research Project was partially or fully sponsor by (Electrical Engineering Department, Pontificia Universidad Católica de Valparaíso).

Conflict of interest

The author declares there is no conflict of interest.