Implementation of preventive maintenance routines and the “zero breakdowns by base condition” methodology in an organization

Claudiney Gomes, Jhonatan Soares, Joventino Lucio, Leandro Ribeiro, Raphael Augusto Parreiras Gallegos, Rarisson Gonçalves

Department of Engineering, University center –UNA, Brazil

Correspondence: Raphael Augusto Parreiras Gallegos, Department of Engineering, University center –UNA, Brazil, Tel +5531984024410

Received: October 04, 2023 | Published: November 2, 2023

Citation: Gomes C, Soares J, Lucio J, et al. Implementation of preventive maintenance routines and the “zero breakdowns by base condition” methodology in an organization. MOJ App Bio Biomech. 2023;7(1):189-196. DOI: 10.15406/mojabb.2023.07.00194

Download PDF

Abstract

This work has the general objective of maximizing the availability and reliability of industrial equipment, reducing the frequency and severity of failures. To achieve this objective, two specific strategies will be implemented: preventive maintenance routines and the "Zero Breakdown by Base Condition" methodology. The implementation of preventive maintenance routines consists of establishing a systematic program of inspections, lubrication, adjustments and replacement of components before failures occur. This proactive approach allows you to identify and correct potential equipment problems, preventing them from becoming critical and causing unscheduled interruptions in production. The best maintenance intervals will be studied, taking into account the characteristics and requirements of each equipment, as well as the analysis of data from previous failures. In addition, the "Zero break by base condition" methodology will be implemented. This approach involves continuous monitoring of equipment conditions using data analysis techniques. The objective is to identify abnormal patterns of operation that may indicate the potential for imminent failure. Based on this information, maintenance can be scheduled appropriately and in advance, avoiding unexpected breakdowns. Various monitoring techniques will be explored, such as vibration analysis, thermography and oil analysis, to obtain a comprehensive view of the equipment condition. The study will be carried out in a specific industry, where data will be collected on the availability and reliability of equipment before and after implementing the proposed strategies. Statistical analyzes will be carried out to evaluate the effectiveness of preventive maintenance routines and the "Zero Breakdown by Base Condition" methodology in reducing failures and increasing equipment availability. It is expected that this work will contribute to the development of more efficient and reliable maintenance practices, promoting the improvement of production processes and reducing costs associated with failures and unscheduled stops. Maximizing equipment availability and reliability will have a direct impact on the efficiency and competitiveness of the industry under study.

Keywords: preventive maintenance, zero breakage by base condition, asset management, maintenance costs

Abbreviations

MB, Mitochondrial diseases; mtDNA, mitochondrial DNA; MRI, magnetic resonance imaging; GTCS, generalized tonic-clonic seizure; HSV, herpes simplex virus; ENMG, electroneuromyography

Introduction

Industrial maintenance plays a fundamental role in ensuring the reliable and efficient performance of equipment. The reactive approach, based on failures after they occur, has been replaced by more proactive practices, such as preventive maintenance. Preventative maintenance consists of carrying out inspections, cleaning, lubrication and scheduled adjustments, with the aim of avoiding failures and maximizing the useful life of the equipment. However, traditional preventative maintenance can be improved by adopting the "Zero Breaks by Base Condition" methodology, which uses continuous monitoring and data analysis technologies to identify failures with greater accuracy and take corrective actions sooner than promised. Maintenance is an essential activity to ensure the reliability, availability and useful life of industrial equipment and systems. An effective preventive maintenance approach can prevent ongoing, unscheduled failures, resulting in greater productivity, reduced costs and increased operational safety. The study carried out has the idea of proposing and implementing strategies that aim to maximize the availability and reliability of equipment, reducing the frequency and severity of failures. These strategies will be based on the adoption of preventive maintenance routines, the implementation of a condition monitoring program and the application of data analysis techniques to predict failures.

Main goal

Maximize equipment availability and reliability, reducing the frequency and severity of failures.

Specific objective

  1. Implement preventive maintenance routines;
  2. Implement the “Zero break by base condition” methodology;

Reference

Maintenance

In industries for several years, equipment maintenance has been used, which consists of maintaining the general good functioning of the machinery. Today in its fourth generation, maintenance has undergone an evolution over the years seeking to improve its methods to obtain better cost and production levels for each period, the main ones being corrective, preventive and predictive maintenance.1

Corrective maintenance

Maintenance is carried out after equipment damage or failure, as the name suggests, correcting the problem and putting the machine back into operation. This type of maintenance has emergency characteristics, that is, immediate action. This may result in additional costs due to moving or purchasing parts without prior planning.1

Preventive maintenance

Preventative maintenance is a set of actions that aim to prevent equipment and system failures, with the aim of avoiding unscheduled downtime and reducing corrective maintenance costs. It involves carrying out periodic inspections, cleaning, lubrication, adjustments, parts exchanges and functional tests, in accordance with manufacturers' recommendations and applicable technical standards.2

Predictive maintenance

Predictive maintenance is based on the analysis of data obtained from the specific equipment that has undergone intervention. In this maintenance, several techniques are adopted to obtain data for analysis such as: Temperature meter, vibration, energy voltage, oil quality, rotation, etc. With these analyzes it is possible to have control over the components, avoiding hasty maintenance and early replacements, thus reducing costs and creating an advantage over other types of maintenance. Planning equipment maintenance activities is necessary to avoid excessive downtime and loss of production with the aim of keeping equipment operating normally without unexpected failures.3

 What are the benefits of preventive maintenance

Effective maintenance policies can influence the productivity and profitability of a manufacturing system, reduce waste, optimize service times, reduce equipment failures, reduce maintenance costs, increase employee safety, increase the useful life of equipment and components.4

This methodology uses well-defined maintenance plans, seeking to improve the availability of machines by reducing downtime due to equipment failure.5

In addition to improving productivity, it is also important to create a culture of commitment to the proper handling and use of equipment to increase the useful life of machines and improve the quality of manufactured products. These implementations aim to improve the Mean Time to Repair (MTTR), Mean time between failures (MTBF) and equipment availability.5

 What impact does preventative maintenance have on the useful life of the equipment?

Preventative maintenance can extend the life of the machine by ensuring that it is kept in good working order and that critical components are replaced or repaired before they fail. This helps to reduce wear and increase the useful life of components, in addition to increasing the reliability of the machine.6

Additionally, preventive maintenance can also improve machine performance, ensuring it runs at optimal efficiency. This can help save money in the long run by reducing energy consumption, increasing productivity, and reducing the need for expensive repairs.

On the other hand, the lack of preventive maintenance can lead to increasing problems, such as frequent failures, unscheduled downtime, loss of production and increased repair costs. Furthermore, it can make the machine unsafe for use, increasing the risk of accidents on site.7

Preventive maintenance costs in the hydraulic system

In the hydraulic system there are several units that are valves, pumps, hydraulic cylinders, among others, a failure at some point in these components can lead to a possible failure in the system, in the working conditions and at the time of preventive maintenance. Viewing the components and applying preventive correction will have the result entirely linked to the next programming, as the objective is to maximize the machine's performance.8

Keeping your hydraulic system up to date is extremely important, as how to have objectives and a cohesive production line to assist in this process, thus ensuring that your equipment works according to the configurations of the manufacturer.9

Preventive maintenance is most often seen as a form of expense, but it is essential to improve performance and avoid loss or replacement of equipment. As each system has its own particularities, it is indeed necessary to pay attention to the previous history and plan in a way that best fits.10

Methodology

Introduction

In some industries, only the corrective maintenance system is still used, causing greater downtime due to the massive use of machinery. Aiming to reduce downtime/breakdown, it is not interesting for machines to remain idle due to ineffective maintenance problems. To reduce machine downtime and generate greater reliability, this work deals with the implementation of the preventive maintenance routine combined with the “zero breaks per base condition” methodology.

Variables

The variables were divided into some groups according to the method that was applied. Table 1 show the routine models used in preventive maintenance.

Routine A

Routine B

Routine C

Checking the port contacts

Column cleaning and inspection

Anti-crush system

Control panel

Automatic redemption test

Well cleaning

Box cleaning

Lubrication

Electrical contact of the Lock (cracked)

Spindle tension

Belt tensioning

Review of spinal fixation

Table 1 Verified routines

When implementing the preventive maintenance routine, some safety systems and conditions for the proper functioning of the accessibility lifting platform were checked and thus they were selected and separated into routines aiming at greater maintenance efficiency.

Depending on the type of equipment/system, preventive maintenance may involve different procedures, parts and time intervals. For example, an accessibility lift requires different preventative maintenance than a refrigeration system.

The frequency of preventive maintenance may vary depending on the type of equipment/system and its importance for business operation.

Some equipment may require daily maintenance, while others may have longer intervals, such as monthly, quarterly or semi-annual. Preventative maintenance involves costs, both in terms of labor, parts and materials.

The purpose of implementing the “zero breakage by base condition” methodology is to establish and maintain the optimal conditions of equipment effectively and at a cost appropriate to business needs, seeking to achieve the “zero breakage” rate, a daily maintenance schedule so that the production employee acts as a guarantor for the preservation of the equipment.

Sample

To carry out the simulation and development of the maintenance routine implementation application, data from a company in the elevator and platform sector focused on accessibility was used as a basis. These data were extracted from the year 2019 until the date of this study, 2023. Excel was used to create tables, and the data system of company “X” in the elevator industry was used to demonstrate the results of applying this methodology.

To carry out the implementation of the “zero breakage by base condition” methodology, the integrity conditions of equipment and process components were evaluated in a robotic cell of a company in the field of manufacturing welded assemblies, defined a base condition and created an action plan, so that the production employee carries out autonomous maintenance, since he is the professional who spends the most time operating the equipment.

Measuring instruments and techniques

In implementing the maintenance routine, data from the company “X” Elevadores was used and after the analysis, measurements of tension, tensioning, durability, continuity and crushing points were used. The post-analysis result was mentioned in Table 1.

In the “zero breakage by base condition” methodology, data from the failure history of a robotic cell from company “Y” was used to create an action plan based on kaizen (continuous improvement), capable of maintaining the equipment in optimal operating conditions through a list of daily checks carried out by the production employee.

Implementation of the maintenance routine.

Table 2 shows the steps taken in implementing the preventive maintenance routines process.

No.

Stage

Description

1

Team separation

An engineer responsible for the company, the maintenance manager and two quality supervisors were selected.

2

Choice of equipment

After the team gathered, a study was carried out looking for one that had the most flaws and the equipment chosen was the accessibility lifting platform.

3

Analysis of equipment safety items

At this stage, the main operating and safety items of the equipment were analyzed.

4

Creation of routines

Having gathered all the items from the previous stage, three maintenance routines were created in A, B and C. The aforementioned items were distributed in them.

5

Training for technicians

With the creation of the routines, it was passed on to the technicians who must carry out the routine so that one is done per month following the sequence A, B and C respectively.

6

Application

After completing the training, technicians are able to continue applying maintenance routines.

Table 2 Implementation of the preventive maintenance routines process

In the case studied, a lifting platform for accessibility was used to implement preventive maintenance routines. This consists of using the methods following a checklist divided by routine of the equipment's main safety items, bearing in mind that the equipment will not work if a security breach occurs.

Implementation of the methodology: “Zero break by base condition”

Table 3 shows the steps taken in implementing the process. An action plan was developed in which information about the tasks to be carried out for the robotic cell of company “Y” is recorded.

Table 3 presents the steps taken during the implementation of the "zero break by base condition" methodology. An action plan was prepared that records information about the tasks to be carried out for the robotic cell of company "Y". The selection of the team allowed the use of different techniques to solve the identified problems. The study carried out resulted in the choice of the Y robotic cell as the target equipment for implementing the methodology. The team identified opportunities for improvement, defined objectives and goals, and built a detailed action plan that included deadlines, responsibilities and budget.

No.

Phases

Description

 

 

1

Project Opening Term

Presentation of the project to company Management.

 

 

2

Team selection

Formation of a team of professionals from different sectors of the company, enabling the use of different techniques to solve different problems.

 

 

 

 

 

 

3

Choice of equipment

A study was carried out using the history of failures, and the Y robotic cell was chosen to implement the methodology.

 

 

 

 

4

Identification of opportunities and improvements

Meeting of the multifunctional team to detect procedural flaws and analyze all problems that need to be resolved.

 

 

5

Goals and objectives

Achieve “zero breakage by base condition”.

 

 

6

Construction of the action plan

Definition of what will be done, when it will be done, by whom it will be done, where it will be done, how much it will cost, what budget is available, etc.

 

 

 

 

7

Execution of activities

According to the action plan, everyone must perform their part, helping others when necessary and respecting the defined budget and deadlines.

 

 

 

 

8

Monitoring and evaluating results

Monitoring the evolution of actions and, if necessary, making the necessary adjustments.

 

 

Table 3 Implementation of the “zero break by base condition” methodology

Project breakdown structure (WBS)

In Figure 1, it is possible to visualize in more detail the stages of implementing the “zero break by base conditions” methodology.

Figure 1 Project Analytical Structure (EAP).

It is a structure that organized the project to implement the “zero break by base condition” methodology, enabled an overview, facilitating better decision-making by the project manager, showed the main phases of the project, mapped the tasks necessary to achieve the expected result.

PLIA – Y robotic cell cleaning and inspection plan

Table 4 shows the production employee's new inspection document, enabling them to act in relation to the preservation and conservation of the equipment.

May 2023

PLIA Activities - Cleaning and Autonomous Inspection Plan for Robotic Cell Y

 

Week 1

Cleaning Activities

Second

Third

Fourth

Fifth

Friday

Clean inductive sensors to ensure their operation

 

 

 

 

 

Keep device clean and organized

 

 

 

 

 

Maintain cleanliness and organization of the Cell

 

 

 

 

 

Clean the robot's gripper by eliminating solder sludge and dust

 

 

 

 

 

Inspection Activities

 

 

 

 

 

Tooling: Inspect wear, play or lack of alignment

 

 

 

 

 

Check whether the hydraulic and pneumatic valves are activated

 

 

 

 

 

Pressure gauge: Inspect the working range of 4 to 6 Bar

 

 

 

 

 

Technological Pins: Inspect wear and fixation to ensure geometry

 

 

 

 

 

Subtitles: C= Conform NC= Non Conform

 

 

 

 

 

Table 4 PLIA - Cleaning and Inspection Plan for Robotic Cell Y

This document shows the items to be inspected by the production employee. If the production employee finds any NC (Non-Conformity) during the inspection, he will open a preventive maintenance order, letting the Maintenance sector know to plan the intervention.

 Working hypothesis

Joint implementations of established practices can result in significant improvements in the company's performance indicators, such as:

  1. Reduction of unscheduled downtime;
  2. Reducing maintenance costs, optimizing the use of resources, increasing productivity and extending the useful life of equipment.

Results

Upon completing the application of the methodology, it becomes evident in several stages where analyzes were conducted to obtain the results of the implementation of preventive maintenance routines and the "Zero Breakdown by Base Condition" approach.

Implementation of the maintenance routine

In this first part, a case of an accessibility lifting platform was analyzed before the use of preventive maintenance routines, as shown in Figure 1. According to the data obtained from company “X” elevators, it is worth highlighting that it did not use the routine preventive maintenance method. , just called correctives.

In Figure 2, the data shows the number of corrective calls answered over a 12-month period on an accessibility lifting platform. Around 17 calls answered, on average 1.41 calls per month in 2019.

Figure 2 Corrective calls before using maintenance routines.

The so-called correctives most often generate repairs, which are relatively parts exchanges and which were sold to the customer according to the pending issue generated. As we see in Figure 3.

Figure 3 Repairs carried out before routine preventive maintenance was used.

This happens because so-called correctives are requested when the equipment stops working. In most cases due to broken parts or misadjustment of systems essential for the operation of the lifting platform. In this case, there were 9 repairs in a 12-month period in 2019.

After these analyzes in 2019, the company “X” Elevadores adopted the routine preventive maintenance method carried out monthly as mentioned in Table 1.

In Figure 4 it is possible to see some details that show the application of the preventive maintenance routine system.

Figure 4 Preventive maintenance by routines carried out.

In Figure 4 it is seen that 12 preventive services were carried out following routines A, B and C (Table 1) respectively during the 12-month period. With it, you can see details of the technician's arrival and departure days on site and the frequency of understanding in addition to the customer served.

After implementation, the result of the same equipment was monitored after 12 months in the following year (2020).11 As shown in Figure 5, a drop in the number of corrective calls is seen.

Figure 5 Corrective calls after using preventive maintenance routines.

As seen, preventive maintenance has an advantage over corrective maintenance. This is due to inspections and adjustments of the main systems and parts of the equipment (accessibility lifting platform) before they become damaged or out of adjustment, causing the equipment to stop. It can be seen in Figure 5 that 3 corrective calls were made, 14 fewer compared to the same equipment in 2019.

However, in Figure 6, it can also be seen that there is a drop in the number of repairs carried out.

Due to the check-ups carried out during preventive maintenance routines, the useful life of the parts is prolonged, thus generating fewer pending parts and therefore needing to be replaced. There were 4 repairs carried out in 12 months in 2020,11 5 repairs less than 2019 on the same equipment, as can be seen in Figure 6.

Figure 6 Repairs carried out after implementing routine preventive maintenance.

It is worth remembering that even though there was a drop in repairs, some were carried out throughout the year. Because even with frequent checks and adjustments, the parts have a useful life. Even if prolonged, they are not eternal and require replacement over time, because each one has a lifespan and follows the manufacturer's instructions.

Results of the implementation of the “zero break by base condition” methodology

Table 5 shows the failure history of robotic cell Y, in the period from January to April 2023. The implementation of the “zero breakage by base condition” methodology was carried out in March 2023.

Note

Description

Order

Date

Installation location

Equipment

Stopped duration

User status

Hinic Av

200997080

Failed cell gateway

71000505

10.01.2023

Y Robotic Cell

140008C001

0.80

PESU

14:00

200997258

Activation failure

70999350

11.01.2023

Y Robotic Cell

140008C001

0.50

PESU

10:30

200999945

Cylinder failure

71002080

01/23/2023

Y Robotic Cell

140008C001

0.24

PESU

17:45

201000764

Maintenance

71002798

01/26/2023

Y Robotic Cell

140008C001

0.64

PESU

15:21

201001915

Failed device

71003970

01/31/2023

Y Robotic Cell

140008C001

0.50

PESU

8 o'clock

201003471

Cylinder failure

71005532

06.02.2023

Y Robotic Cell

140008C001

1.01

PESU

12:42

201006308

Maintenance

71007384

02/08/2023

Y Robotic Cell

140008C001

0.38

PESU

10:07

201006560

Failed SX line

71007742

09.02.2023

Y Robotic Cell

140008C001

0.48

PESU

10:41

201007583

Weld bead adjustments

71009145

02/13/2023

Y Robotic Cell

140008C001

1.73

PESU

09:00

201009666

More adjustments/adjustments...

71011127

23.02.2023

Y Robotic Cell

140008C001

0.30

PESU

07:09

201010271

Op sensor failure. 05.

71011714

24.02.2023

Y Robotic Cell

140008C001

0.50

PESU

09:30

201016204

Absence of part

71016806

10.03.2023

Y Robotic Cell

140008C001

0.21

PESU

13:22

201016621

Failure to assemble the

71017320

03/13/2023

Y Robotic Cell

140008C001

0.33

PESU

14:10

201016847

Robot does not deposit part

71017492

03/14/2023

Y Robotic Cell

140008C001

0.44

PESU

13:03

201017316

Maintenance

71017769

03/16/2023

Y Robotic Cell

140008C001

0.30

PESU

07:12

201019845

Maintenance

71020369

03/24/2023

Y Robotic Cell

140008C001

0.40

PESU

14:00

201024018

Maintenance

71024653

04/12/2023

Y Robotic Cell

140008C001

0.16

PESU

08:28

201024263

Maintenance

71024838

04/13/2023

Y Robotic Cell

140008C001

0.23

PESU

07:14

201025011

Leaking water

71026074

04/15/2023

Y Robotic Cell

140008C001

0.45

PESU

09:00

201025015

Align electrode holder

71026073

 

Y Robotic Cell

140008C001

0.25

PESU

11:00

Table 5 History of Y robotic cell failures in the period from January to April 2023

During the analysis period, there were 5 interventions in the month of January, generating 160.8 minutes of unscheduled stops in the month due to equipment breakdown, in February there were 6 interventions generating 264 minutes of stops, in March there were 5 interventions generating 100.8 minutes of stops and in April there were 4 interventions generating 65.4 minutes of unscheduled stops due to equipment breakdown, as can be seen in Table 5.

With the implementation of the “zero breakage by base condition” methodology, the equipment broke down less in March and April, making it more available for production.

Table 6 shows the MTBF and MTTR of robotic cell Y. It can be observed the increase in MTBF and the reduction in MTTR in March and April with the implementation of the “zero break by base condition” methodology, in relation to January and February 2023 without implementation.

Year 2023

Scheduled time

Total stop time

Number of stops

MTBF

MTTR

January

333.46

2.68

5

66.16

0.54

February

280.86

4.40

6

46.08

0.73

March

346.61

1.68

5

68.99

0.34

April

291.90

1.09

4

72.70

0.27

Table 6 Analysis of MTBF and MTTR of robotic cell Y in the period from January to April 2023

Table 6, shows the first pillar, the months of analysis of 2023, the second pillar, shows the total time scheduled for each month to produce on the equipment in hours, the third pillar, shows the total downtime for each month in hours, the fourth pillar, shows the total number of stops in each month, the fifth pillar, shows the MTBF for each month and the sixth pillar, shows the MTTR for each month.

MTBF is an indicator that analyzes the average time between failures, that is, the longer the average time between one failure and another, the better. The MTBF is determined by Equation 1.

MTBF =  Scheduled time  Total stop time Number of stops MathType@MTEF@5@5@+= feaagKart1ev2aqatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbujxzIv3yOvgDG00uaerbd9wD YLwzYbItLDharqqtubsr4rNCHbGeaGqkY=MjYJH8sqFD0xXdHaVhbb f9v8qqaqFr0xc9pk0xbba9q8WqFfea0=yr0RYxir=Jbba9q8aq0=yq =He9q8qqQ8frFve9Fve9Ff0dmeaabaqaciGacaGaaeaadaabaeaafa aakeaaqaaaaaaaaaWdbiaad2eacaWGubGaamOqaiaadAeacaGGGcGa eyypa0JaaiiOamaalaaapaqaa8qacaWGtbGaam4yaiaadIgacaWGLb GaamizaiaadwhacaWGSbGaamyzaiaadsgacaqGGaGaamiDaiaadMga caWGTbGaamyzaiaacckacaGGtaIaaiiOaiaadsfacaWGVbGaamiDai aadggacaWGSbGaaiiOaiaadohacaWG0bGaam4BaiaadchacaGGGcGa amiDaiaadMgacaWGTbGaamyzaaWdaeaapeGaamOtaiaadwhacaWGTb GaamOyaiaadwgacaWGYbGaaiiOaiaad+gacaWGMbGaaiiOaiaadoha caWG0bGaam4BaiaadchacaWGZbaaaaaa@6FE1@   (1)

Where:

  • MTBF = mean time between failures;
  • Scheduled time = Time in hours;
  • Total stop time = Time in hours;
  • Number of stops = Number of stops.

MTTR is an indicator that analyzes the average repair time, it divides the total downtime by the number of failures, the shorter the average repair time, the better. The MTTR is determined by Equation 2.

MTTR =  Total repair time Number of stops MathType@MTEF@5@5@+= feaagKart1ev2aqatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbujxzIv3yOvgDG00uaerbd9wD YLwzYbItLDharqqtubsr4rNCHbGeaGqkY=MjYJH8sqFD0xXdHaVhbb f9v8qqaqFr0xc9pk0xbba9q8WqFfea0=yr0RYxir=Jbba9q8aq0=yq =He9q8qqQ8frFve9Fve9Ff0dmeaabaqaciGacaGaaeaadaabaeaafa aakeaaqaaaaaaaaaWdbiaad2eacaWGubGaamivaiaadkfacaGGGcGa eyypa0JaaiiOamaalaaapaqaa8qacaWGubGaam4BaiaadshacaWGHb GaamiBaiaacckacaWGYbGaamyzaiaadchacaWGHbGaamyAaiaadkha caGGGcGaamiDaiaadMgacaWGTbGaamyzaaWdaeaapeGaamOtaiaadw hacaWGTbGaamOyaiaadwgacaWGYbGaaiiOaiaad+gacaWGMbGaaiiO aiaadohacaWG0bGaam4BaiaadchacaWGZbaaaaaa@6223@   (2)

Where:

  • MTTR = Average Repair Time
  • Total repair time = Time in hours;
  • Number of stops = Number of stops.

Table 7 shows the Availability of robotic cell Y in the analysis period.

Scheduled time

Total stop time

Availability

333.46

2.68

99.20%

280.86

4.40

98.43%

346.61

1.68

99.52%

291.90

1.09

99.63%

Table 7 Availability Analysis of robotic cell Y in the period from January to April 2023

The Y robotic cell presented 99.20% availability in January, in February the cell's availability reduced to 98.43% and with the implementation of the “zero breakdown due to base conditions” methodology the availability indicator rose to 99.52% in March and 99.63% in April.

The last step is to calculate availability, which is the indicator that analyzes the percentage of time that the equipment was available for production. Availability is determined by Equation 3.

Availability =  Charging time  Total stopping time Charging time MathType@MTEF@5@5@+= feaagKart1ev2aaatCvAUfeBSjuyZL2yd9gzLbvyNv2CaerbuLwBLn hiov2DGi1BTfMBaeXatLxBI9gBaerbujxzIv3yOvgDG00uaerbd9wD YLwzYbItLDharqqtubsr4rNCHbGeaGqkY=MjYJH8sqFD0xXdHaVhbb f9v8qqaqFr0xc9pk0xbba9q8WqFfea0=yr0RYxir=Jbba9q8aq0=yq =He9q8qqQ8frFve9Fve9Ff0dmeaabaqaciGacaGaaeaadaabaeaafa aakeaaqaaaaaaaaaWdbiaadgeacaWG2bGaamyyaiaadMgacaWGSbGa amyyaiaadkgacaWGPbGaamiBaiaadMgacaWG0bGaamyEaiaacckacq GH9aqpcaGGGcWaaSaaa8aabaWdbiaadoeacaWGObGaciyyaiaackha caGGNbGaaiyAaiaac6gacaGGNbGaaGPaVlaacckacaWG0bGaamyAai aad2gacaWGLbGaaiiOaiaacobicaGGGcGaamivaiaad+gacaWG0bGa amyyaiaadYgacaGGGcGaam4CaiaadshacaWGVbGaamiCaiaadchaca WGPbGaamOBaiaadEgacaGGGcGaamiDaiaadMgacaWGTbGaamyzaaWd aeaapeGaam4qaiaadIgaciGGHbGaaiOCaiaacEgacaGGPbGaaiOBai aacEgacaGGGcGaaGPaVlaadshacaWGPbGaamyBaiaadwgaaaaaaa@7BCA@  (3)

Where:

  • Charging time= Time in hours;
  • Total stop time = Time in hours.

The objective of implementing the “zero break by base condition” methodology was successfully achieved, as the company's goal was to achieve an index of 68 hours/month in the MTBF indicator, reaching 0.5 hours/month in the indicator of MTTR and reach 99.5% in the equipment availability indicator.

Conclusion

It was demonstrated throughout the work that the implementation of preventive maintenance routines and the "Zero Breakdown by Base Condition" methodology is an effective strategy to improve asset management and increase the availability of industrial equipment, as the number of of unscheduled downtime of machines as the change from corrective to preventive maintenance.

These practices allowed the proactive identification of problems and the carrying out of precise interventions, avoiding unexpected failures and reducing maintenance costs. The author Serra, Danilo da Silva et al. (2022)2 mentions preventive maintenance and raised in the objective generates which aims to maximize, availability and reliability of equipment, reducing the frequency and severity of failures, which corroborates this work.

The methodologies implemented offered an advanced approach to monitoring and data analysis, contributing to a continuous cycle of improvement in industrial maintenance such as: reducing unscheduled downtime, reducing maintenance costs, optimizing the use of resources, increasing productivity and prolongation of the useful life of equipment resulting in the purpose of specific work objectives. It is expected that the implementation of preventive maintenance routines and the "Zero Breakdown by Base Condition" methodology will significantly contribute to maximizing equipment availability and reliability, reducing the frequency and severity of failures. This will bring economic and operational benefits to the industry, such as reduced repair costs, increased productivity and improved customer satisfaction.

Acknowledgments

None.

Funding

None.

Conflicts of interest

The authors declare that there are no conflicts of interest.

References

  1. Moreira Venâncio A. Federal University of Rio Grande Do Norte technology center mechanical engineering course development and application of management tools aimed at preventive maintenance.
  2. da Silva ET, Piratelli CL, Achcar JA. Study of equipment maintenance at an ethanol plant under the MCC methodology (reliability-centered maintenance) methodology. Producao Online. 2020;20(4):1331–1353.
  3. Teles J. Uncomplicated Maintenance Planning and Control: a step-by-step methodology for implementing PCM. Brasilia: Engeles Editora. 2019:239.
  4. Kuboki N, Takata S. Selecting the optimum inspection method for preventive maintenance. Procedia CIRP. 2019;80:512–517.
  5. Pinto G, Silva FJG, Baptista A, et al. TPM implementation and maintenance strategic plan - A case study. Procedia Manufacturing. 2020;51:1423–1430.
  6. Alcântara L, Medeiros A, da R Fernandes S, et al. Reliability analysis to reduce the number of corrective maintenance on off-highway trucks. 2019.
  7. De Almeida Júnior JC, Parra RB. Predictive & detective maintenance: effective tools in the management of aeronautical products. 2018.
  8. Koopmans M, de Jonge B. Condition-based maintenance and production speed optimization under limited maintenance capacity. Computers & Industrial Engineering. 2023;179:109155.
  9. Chaves FRL. Application of reliability-centered maintenance to develop a maintenance strategy for the hydraulic system of the CAT 416 D backhoe loader: a case study. 2018.
  10. van Staden HE, Deprez L, Boute RN. A dynamic “predict, then optimize” preventive maintenance approach using operational intervention data. European J Operational Res. 2022;302(3):1079–1096.
  11. Huang J, Chang Q, Arinez J. Deep reinforcement learning based preventive maintenance policy for serial production lines. Expert Syst Appl. 2020;160:113701.
Creative Commons Attribution License

©2023 Gomes, et al. This is an open access article distributed under the terms of the, which permits unrestricted use, distribution, and build upon your work non-commercially.